Next week, a wood fence is scheduled to be installed around part of the back yard to enclose it (the rest of the back yard is already fenced).
Painting in Spencer's room is complete.
The bottom cabinets still need doors installed on them, but this room is essentially ready for curtains.
The master bedroom trim was sanded for a second time, the bottom half of the walls were sanded, and it was all re-painted.
The master closet cabinets are getting installed and painted this week too.
The balusters - if that term applies when the parts are metal - are off getting painted while the handrails and treads are getting stained.
The living room floor had 88 large nail and screw holes that were filled, first with wood filler, but that didn't take the stain well, so the filler was scooped out, and the holes were filled with wooden discs that were then sanded and stained. So...much...work...
And in the kitchen, all the trim is in and the appliances - that we have - are installed, though the fridge still needs the panels installed. All the faucets and garbage disposal are installed. Hopefully our new range arrives before we move!
Next week is the last week of work before we move in. More painting and some basement electrical work are scheduled, and then it's time to clean.